Projects

2007

JSC “Kazakhstan Aluminum Smelter”

1. Expansion of “Kazakhstan Aluminum Smelter” JSC up to 1.6 mln tons per year – 1 stage
2. Expansion of “Kazakhstan Aluminum Smelter” JSC up to 1.7 mln tons per year – 2 stage
3. Reconstruction of the electrofilter #5
4. Open distribution unit renovation project – 110 kW
5. Assembling design of the additional feed electric pump st.#9 at the heat power plant (HPP) of “Kazakhstan Aluminum Smelter” JSC


2008

“KazZincTech” LLP

1. Interfusing station of a transmission system construction
2. Expansion of the draining system on the cycle of contaminated outflow
3. Expansion of the chemically purified water production up to 100 m3/h

 

“Eurasian Energy Corporation” (EEC) JSC

1. Five-storied large-panel apartment block reconstruction in Ekibastuz

 

HPP1 of “Kazakhstan Aluminum Smelter” JSC

1. Electrolysis unit SEU10 st.#1 replacement
2. Reconstruction of the automated fire-fighting system of the HPP cable ducts
3. Section 4 of the main steam pipe replacement
4. Ash collector of the vessel st.#8 reconstruction

 

“Kazakhstan Aluminum Smelter” JSC

1. Construction of the reinforced concrete funnel 120 meters high
2. Construction of the furnace line of alumina baking #8
3. Gas recovery setup of the coal gasification plant
4. Construction of the damping machine #3 with crushing and separation unit
5. Construction of the raw material supply route with 5 homogenization storage spaces and 2 rotary excavators.


2009

HPP of “Kazakhstan Aluminum Smelter” JSC

1. Cooling towers CCT – 1600 st.#1, 2 reconstruction
2. Installation of the stack gas cleaning of the boiler units #1-8
3. Replacement of the main steam piping of the turbo generators #4, 2
4. Replacement of high pressure preaheater of turbo generator st.#3
5. Hydraulic ash removal route reconstruction
6. Installation of the additional 3d group of plantwide high-pressure preheaters
7. Gas analysis complex FACP-Ecomer (fixed automated control point) installation
8. Ash collector b/u #7 reconstruction
9. Heating water converter plant reconstruction
10. Fuel feed line reconstruction
11. Replacing the motor drives of the boiler unit st.# 1, 2 with variable-frequency drives

 

“Kazakhstan Aluminum Smelter” JSC

1. Replacement of the 4 vertical filters from the calcination furnace

 

“Kazakhstan Aluminum Smelter” JSC KBMD branch

1. Open cast #9 of Ayat land deposit (acquisition of orebody 64-69)

 

Ekibastuz GRES-1

1. Reconstruction of the hydraulic ash removal for electrofilter of the block #5


2010

“Omega” LLP

1. Rearranging a youth club to a restaurant (Pavlodar)

 

HPP of “Kazakhstan Aluminum Smelter” JSC

1. Replacement of the main and firing-up steam pipes of the vessel st.#1, 3, 4

 

“Sokolovsk-Sarbaysk Ore Dressing Industrial Association” JSC

1. Industrial building with car wash for 5 vehicles

 

“Sogra HPP”

1. Developing the dust suppression system of the fuel feed line

 

“Bogatyr Coal” LLP

1. Structural assessment of the facilities at “Bogatyr” opencast

 

“Belinsky Bauxite Mine”

1. Opencast for acquisition of the fields 9-10, 18, 19, 20


2011

“Samryk-EnergyStroyService” (Almaty)

1. Reconstruction and expansion of Almaty HPP-2 boiler unit st.#8

 

“Almaty Power Stations” JSC (Almaty)

1. Feasibility study of “Modernization and expansion at HPP “APS” JSC switching to gas and steam gas turbine unit”

 

“Kazakhstan Aluminum Smelter” JSC

1. Construction of the fan cooling tower on the existing section of the dirt collector of reinforced concrete cooling tower #1.
2. Work design: “Modernization of gas cleaning units of the sintering furnace #1-7 replacing the electofilters #1-13″
3. Feasibility study of “HPP “Kazakhstan Aluminum Smelter” JSC dumping place construction (modernization)

 

“Heating network-Holding” LLP (Rudny)

1. SSODIA JSC HPP vessel БКЗ-220 st.№4,5 flues reconstruction


2012

“Kazakhstan Aluminum Smelter” JSC

1. Raw material preparation unit. Control drawing of the continuous handling system modernization
2. “Kazakhstan Aluminum Smelter” JSC HPP the drum b/u БКЗ420-140-1 st.#3 replacement
3. “Kazakhstan Aluminum Smelter” JSC HPP steam superheater st.#4 reconstruction
4. “Kazakhstan Aluminum Smelter” JSC HPP separator of the continuous blowdown b/u №6 replacement
5. “Kazakhstan Aluminum Smelter” JSC HPP the feed system СТС300-800-2,5 т/а st.№3 ТС-63-283 reconstruction
6.”Kazakhstan Aluminum Smelter” JSC HPP the electrolysis unit SEU-10 replacement

 

“Kompaniya Neftechim LTD” LLP (Pavlodar)

1. Pressure-reducing and desuperheating station reconstruction
2. Designing the external lines of the electric power supply


2013

“Karaganda Bi Energy Plus” LLP

1. Installation design “Reconstruction and engineering modernization of the existing water treating plant for needs at “Station Ekibastuz GRES-2″ JSC”.

 

” Station Ekibastuz GRES-2″ JSC

1. Feasibility study of “Constriction of the 4th power generating unit at Ekibastuz GRES-2 with at least 600 MW”.

 

“Astana Spetcmontazh” LLP

1. Engineering documentation “Expansion and reconstruction at Ekibastuz GRES-2 assembling power generating unit st.#3 with at least 600 MW”.

 

“Almaty Power Stations” JSC (Almaty)

1. Design “Reconstruction and expansion at HPP-1 “APS” JSC switching to gas and steam gas turbine unit».

 

“Balkhash Thermal Power Plant” JSC

1. Working out the design documentation of “Construction of the recycling bottom ash waste plants”.

 

“Sokolovsk-Sarbaysk Ore Dressing Industrial Association” JSC

1. Project engineering and specification documentation: “SSODIA” JSC. Reconstruction of the drying lines #1-6″.

 

“Kazakhstan Aluminum Smelter” JSC

1. Working out the design documentation: “Reconstruction of the existing ash dump facilities at HPP.

 

“Almaty Power Stations” JSC (Almaty)

1. Adjustment of the construction schedule and financial and economic issues of the feasibility study: “Reconstruction and expansion at the “APS” JSC HPP-1 switching to gas and steam gas turbine unit.

 


2014

“Karaganda BI Energy Plus” LLP

1. Project engineering and detailed design: “Industrial complex of fuel supply reconstruction and modernization at “Ekibastuz GRES-1 named after B.Nurzhanov” LLP.

2. Working out of installation design: “TPP. Main and firing-up steam pipes of the vessel st.#5″.

“Almaty Power Stations” JSC (Almaty)

1. Development of feasibility study: “Expansion of HPP-1 assembling a new power source based on gas-turbine technologies”.

2. Development of feasibility study: “Reconstruction of western thermal complex at “APS” JSC.

“KazNIIEnergoprom” Institute” JSC

1. Adjusting of feasibility study “Construction of Balkhash TPS with 1320 MW.

2. Adjusting of the sections: ash and slag lines and water storage-cooler blowdown pipeline route.

“Eurasian Energy Corporation” JSC

1. Development of the project: “Replacing the regeneration of high-pressure unit №4»

“Kazakhstan Aluminium” JSC

1. Development of the project: “Replacement of the peak boiler (RB-4) in the turbine shop CHP»

2. Development of the project “Replacement deaerator DB 6 ata Art. №3 in the turbine shop CHP »