Reviews

Limited Liability Partnership

“Pavlodar Construction and Assembly Company”

140000, Eastern Industrial District, Pavlodar City,

Pavlodar Region, Republic of Kazakhstan,

Tel: 8(7182)606210, fax: 8(7182) 606211

To The Director of

“StroyIndustriya” LLP

Mr. Mustafin S.K.

Pavlodar

Executed work review

“StroyIndustriya” LLP

The specialists of “StroyIndustriya” LLP has developed a design estimate documentation for “Kazakhstan Aluminum Smelter” JSC construction facilities (architectural and building specifications).

- The main and firing-up steampipe of boiler st. 1,3,4 replacement

First class critically rating of the facility.

For the time of work “StroyIndustriya” LLP has proved to be a highly experienced project institute. All the documentation is developed in accordance with current norms, rules and standards. The work of related departments is organized very well: beginning with receiving an assignment from the client to the release of documentation. Your specialists take initiatives and make arrangements with client representatives and operating team. Execution of documentation corresponds to standards of Republic of Kazakhstan. Amendments are made immediately at the same time specialists keep a record of documentation at high level.

“Pavlodar Construction and Assembly Company” LLP is looking forward to further cooperation with “StroyIndustriya” LLP.

The Director of “Pavlodar Construction and Assembly Company”

 

 

Limited Liability Partnership

“Pavlodar Construction and Assembly Company”

140000, Eastern Industrial District, Pavlodar City,

Pavlodar Region, Republic of Kazakhstan,

Tel: 8(7182)606210, fax: 8(7182) 606211

To The Director of

“StroyIndustriya” LLP

Mr. Mustafin S.K.

Pavlodar

Executed work review

“StroyIndustriya” LLP

The specialists of “StroyIndustriya” LLP has developed design estimate documentation, architectural and building specification for “Baking Plant. Furnace #8” at “Kazakhstan Aluminum Smelter” JSC.

First class critically rating of the facility.

For the time of work “StroyIndustriya” LLP has proved to be a highly experienced project institute. All the documentation is developed in accordance with current norms, rules and standards. The work of related departments during the design time was organized very well. Your specialists make arrangements with client representatives and operating team. Execution of documentation corresponds to standards of Republic of Kazakhstan. Amendments are made immediately due to process refinement at the same time specialists keep a record of documentation at high level.

The Director of “Pavlodar Construction and Assembly Company”

 

 

 

 

To The Director of

“StroyIndustriya” LLP

Mr. Mustafin S.K.

Pavlodar

 

 

 

Executed work review
“StroyIndustriya” LLP

The specialists of “StroyIndustriya” LLP by the virtue of the treaty has developed design estimate documentation, architectural and building specification for “Kazakhstan Aluminum Smelter” JSC HPP” “Heating water converter plant reconstruction”.

First class critically rating of the facility.

During the work execution the specialists of “StroyIndustriya” LLP has proved to be a highly experienced and responsible. The specialists of “StroyIndustriya” LLP did well with the assigned tasks following the requirements.

“StroyIndustriya” LLP has a great experience in developing design documentation for construction and reconstruction of power plant power generating units which draw forth to choose “StroyIndustriya” LLP as subcontractor.

The Director of “Diapazon” LLP

 

 

 

 

To The Director of

“StroyIndustriya” LLP

Mr. Mustafin S.K.

 

 

 

 

 

Executed work review

“StroyIndustriya” LLP

The specialists of “StroyIndustriya” LLP has developed design estimate documentation for “Kazakhstan Aluminum Smelter” JSC facilities.

- Reconstruction of fuel conveying system at “Kazakhstan Aluminum Smelter” JSC HPP

First class critically rating of the facility.

During the work execution the specialists of “StroyIndustriya” LLP has proved to be a highly experienced project institute. All the documentation is developed in accordance with current norms, rules and standards. The work of related departments is organized very well: beginning with receiving an assignment from the client to the release of documentation.

Your specialists take initiatives and make arrangements with client representatives and operating team.

Execution of documentation corresponds to standards of Republic of Kazakhstan.

Amendments are made immediately at the same time specialists keep a record of documentation at high level.

“Diapazon” LLP is looking forward to further cooperation with “StroyIndustriya” LLP.

The Director of “Diapazon” LLP

 

 

 

 

To The Director of

“StroyIndustriya” LLP

Mr. Mustafin S.K.

From “Almaty Power Stations” JSC

 

 

 

 

Executed work review

Dear Serikzhan Kusainovich!

“StroyIndustriya” LLP provided a set of works for the project “Adjustment of a construction schedule and financial and economic documentation of technical and economic assessment “Reconstruction and Expansion of HPP-1 switching to gas and gas turbine plant” “APS” JSC”.

The work had been done in full range beginning with developing the technical and economic assessment to engineering documentation.

During work execution all guideline and regulatory documents requirements were taken into consideration in accordance with ISO international standards.

The activities were performed at facilities with different complexity and were executed at high engineering level in accordance with given technical requirements.

The works were finished in time and of good quality. Acceptance of the facilities into service had only inessential remarks of the Customer and regulatory authorities.

I would like to wish you, Serikzhan Kusainovich and your colleagues, further success, luck and prosperity. I am persuaded our cooperation will be pleasant and mutually beneficial.

Best regards,

Managing Director

 

 

 

To The Director of

“StroyIndustriya” LLP

Mr. Mustafin S.K.

68/2 Toraygyrov Street, Pavlodar

 

 

 

 

 

Corporate activities review

“Kazakhstan Aluminum Smelter” JSC collaborates with “StroyIndustriya” LLP since 2011. The institute has developed estimate documentation of a lot of plant facilities. Thus institute developed the following designs in 2012:

  1. “Kazakhstan Aluminum Smelter” JSC HPP steam superheater b/u st.#4 reconstruction
  2. “Kazakhstan Aluminum Smelter” JSC HPP the drum b/u st.#3 replacement
  3. “Kazakhstan Aluminum Smelter” JSC HPP separator of the continuous blowdown b/u №6 replacement
  4. “Kazakhstan Aluminum Smelter” JSC HPP the electrolysis unit SEU-10 replacement

Aforesaid works were kept to schedule and of good quality in line with all construction norms and regulations and safety standards.

The specialists of “StroyIndustriya” LLP have proved their high professional level in developing, designing and reconstruction issues.

Currently the institute is providing works on “Reconstruction of existing ash dump facilities at HPP”. The works are performed according to the schedule.

“Kazakhstan Aluminum Smelter” JSC” is looking forward to further cooperation.